23D — Pre-construction coordination & delivery
SHT A-101 / 09
REV 03 2026.06.18, COPY ALIGNED TO V1
A B C D
23D / PRE-CONSTRUCTION COORDINATION & DELIVERY

Break ground
with certainty.

23D unifies all your consultant drawings into one three-dimensional source of truth. You then:

  • Review every issue and clash before breaking ground.
  • Send trades an auto-generated material list, so every bid is priced off the same amounts. Apples to apples.
  • Visualize and communicate your build in 3D. Onsite, in the office, anytime.
SERVICES FOR
Wood-framed multi-family / custom homes / laneways / multiplex / infill , SMALL & MID-SIZE BUILDERS
YOU GET
Coordination model / BOM / conflict report , REVIEWED OUTPUTS FOR CONFIRMED SCOPES
47'-6"
3D coordination model
A
B
C
ISOMETRIC · COORDINATION MODEL · NTS
N
01020'
23D · CONSTRUCTION COMPILER · DRAWING SET 01
Overview
SCALE
NTS
DATE
2026.06.18
DRAWN
23D / MJ
REV
03
LOCATION · 23D.CA / HOME
A-101
SHT A-201 / 09
REFERENCE FILM · SECTION VIEW

Drawings in.
Proof out.

DURATION · 48 SEC
INPUT → COMPILE
→ VERIFY → DELIVER
HOVER TO PLAY · 48 SEC
01 INPUT 02 COMPILE 03 VERIFY 04 DELIVER
SHEET A-201 / DETAIL 1 · FILM SCALE NTS · AUDIO MUTED
23D · CONSTRUCTION COMPILER · DRAWING SET 01
Reference Film, 48 sec
SCALE
NTS
DATE
2026.06.18
DRAWN
23D / MJ
REV
03
LOCATION · 23D.CA / FILM
A-201
SHT A-301 / 09
THE PROBLEM

Construction
sucks.

Your drawings don't lie. They just don't agree.

NOTE 01 / PAIN
PAIN 01 · WON'T ASSEMBLE

Every designer and every engineer produces drawings. Put it all together onsite, and it can't be built.

NOTE 02 / PAIN
PAIN 02 · BIDS DON'T MATCH

Every tendering trade makes different assumptions, so you get wildly different prices.

23D · CONSTRUCTION COMPILER · DRAWING SET 01
Problem, Pain Schedule
SCALE
NTS
DATE
2026.06.18
DRAWN
23D / MJ
REV
03
LOCATION · 23D.CA / HOME
A-301
SHT A-401 / 09
HOW IT WORKS · PROCESS DIAGRAM

Three steps
to certainty.

Drawings in, proof out. Inputs reviewed, scope confirmed, clearer decisions before you build.

01

Submit your drawings

Submit all your drawings. DXF preferred, but PDFs work great too.

02

Receive your coordinated model

In a few hours, 23D returns your coordination model, bill of materials, and clash report.

03

Review & build

Review the issues, hand the bill of materials to your trades to bid on, and share the 3D model with your team.

23D · CONSTRUCTION COMPILER · DRAWING SET 01
Process, Workflow Diagram
SCALE
NTS
DATE
2026.06.18
DRAWN
23D / MJ
REV
03
LOCATION · 23D.CA / HOME
A-401
SHT A-501 / 09
DELIVERABLE 01 · COORDINATION MODEL

Walk the model
yourself.

The whole-building coordination model, live in your browser. Architectural and structural reconciled into one source of truth.

DRAG · ORBIT
SCROLL · ZOOM
RIGHT-DRAG · PAN
LIVE 3D · SHADED · DRAG TO ORBIT
SHEET A-501 / DETAIL 1 · INTERACTIVE MODEL VIEWER WHOLE-BUILDING COORDINATION MODEL · .3DM
23D · CONSTRUCTION COMPILER · DRAWING SET 01
Deliverable 01 / Coordination Model
SCALE
LIVE
DATE
2026.06.18
DRAWN
23D / MJ
REV
03
LOCATION · 23D.CA / MODEL
A-501
SHT A-601 / 09
DELIVERABLE 02 · CLASH REPORT

Conflicts surface here.
Not on site.

CONFLICTS FOUND
47
CAUGHT · PRE-SITE DAY ONE
REF
LOCATION
DESCRIPTION
TYPE
REV
047
North roof deck
Beam B8 on B6 sits too high, conflicting with the flat roof.
STRUCT / ARCH
03
112
Roof staircase
Same beam conflicts with the staircase wall and finished floor.
STRUCT / ARCH
03
203
First floor
Duct run conflicts with floor framing, caught across trades, not on site.
HVAC / STRUCT
03
Roof beam clash
A
DETAIL A · CLASH 047
ROOF BEAM / NORTH DECK
Staircase clash
B
DETAIL B · CLASH 112
STAIRCASE / FINISHED FLOOR
HVAC clash
C
DETAIL C · CLASH 203
HVAC DUCT / FLOOR FRAMING
23D · CONSTRUCTION COMPILER · DRAWING SET 01
Deliverable 02 / Clash Report
SCALE
NTS
DATE
2026.06.18
DRAWN
23D / MJ
REV
03
LOCATION · 23D.CA / SAMPLE
A-601
SHT A-701 / 09
DELIVERABLE 03 · BILL OF MATERIALS

Bill of
materials.

Every stud, joist, beam, plate and sheet — counted from the model, not estimated. One material list your trades bid off, so the numbers match. A few lines from a sample wood-frame schedule are shown below; the real report runs across every structural and wall-framing category.

BOM SCHEDULE · SAMPLE EXTRACT CSV · PDF · JSON
#
CATEGORY
SPEC
LEVEL
QTY
LENGTH
UOM
STRUCTURAL · beams · joists
01
Beam
3.5 × 9.5 PSL 2.2E
L1, L2
18
220.0
ea
02
Beam
1.75 × 7.25 LVL 2.0E
L1, L2
16
188.0
ea
03
Joist
9.5″ I-joist
L1, L2
92
1,200.0
ea
WALL FRAMING · studs · plates · headers
04
Stud
2 × 4 SPF, field + corner
all levels
980
8,820.0
ea
05
Plate
2 × 4 SPF, 1 bot + 2 top
all levels
240
2,160.0
lf
06
Header
2 × 10 SPF
L1, L2, L3
32
256.0
ea
SHEATHING · wall · roof
07
Ext wall
1/2″ CDX plywood, 4×8
L1, L2, L3
96
3,072.0
sht
08
Roof
1/2″ CDX plywood, 4×8
Roof
40
1,280.0
sht
SAMPLE LINES ONLY · FULL SCHEDULE TYPICALLY 100+ ROWS · PRICED BY YOUR TRADES, APPLES TO APPLES
23D · CONSTRUCTION COMPILER · DRAWING SET 01
Deliverable 03 / Bill of Materials
SCALE
NTS
DATE
2026.06.18
DRAWN
23D / MJ
REV
03
LOCATION · 23D.CA / SAMPLE
A-701
SHT A-801 / 09
ABOUT US · PROJECT NOTES

Built by
builders.

GENERAL NOTES · WHO WE ARE
  1. We are a team of builders and vets in construction, architects, engineers, contractors, people who have been on site.
  2. We've suffered all the pains: drawings that don't line up, mismatched coordinate systems, wildly different bids, clashes found only after breaking ground.
  3. 23D is the tool we built for ourselves and our friends, solving our own problems first, then turning it into a product.
DESIGN CRITERIA · WHY 23D
CRITERION 01

You're buying certainty

You're buying pre-construction certainty. No buzzwords. What v1 can and cannot do, we say clearly.

CRITERION 02

One source of truth

Architectural and structural drawings reconciled into a single coordinated model, not five versions of the same building.

CRITERION 03

Built with builders

Solving our own problems first, then turning it into a product for builders like us.

23D · CONSTRUCTION COMPILER · DRAWING SET 01
About Us, Team Notes
SCALE
NTS
DATE
2026.06.18
DRAWN
23D / MJ
REV
03
LOCATION · 23D.CA / ABOUT
A-801
SHT A-901 / 09
PROJECT INTAKE · ISSUED FOR CONSTRUCTION

Real projects
start here.

Send your drawings and requirements. 23D reviews the input, confirms scope and deliverables, then starts execution for accepted projects.

This is not self-serve. You submit drawings and project context; 23D evaluates and tells you what can be done, what gets delivered, and what comes next.

INTAKE PROCESS · ONE SUBMISSION
01
Everything in one submission, no back-and-forth needed.
02
In-scope projects get model content, BOM, check scope, and a timeline.
03
Out-of-scope projects get an explicit answer, not silence.
Leave the essentials FORM A-901
DROP FILE OR CLICK TO ATTACH
Optional, but scale, outputs & timing should be clear.

We'll review it and follow up using the contact details you provide.

ISSUED FOR
CONSTRUCTION
↻ TAP THE STAMP
POW!
23D · CONSTRUCTION COMPILER · DRAWING SET 01
Project Intake, Submission
SCALE
NTS
DATE
2026.06.18
DRAWN
23D / MJ
REV
03
LOCATION · 23D.CA / INTAKE
A-901