Summary
- Stories4
- Floorslevel_1, level_2, level_3, level_4
23D / Pre-construction coordination & delivery
23D translates drawings into one unified building language, then compiles a 3D model with bill of materials and clash report. Can it be built? Where are the clashes? How much material to buy? All answered before breaking ground.
23D stands for 2D to 3D understanding, delivered at low cost, digitally.
Want to try first? Open the online demo.
GH_test11.3dm
Model still
Full-building coordination model output by 23D, including structural framing, HVAC, fire sprinkler, and clash detection.

Summary
Deliverables
Checks
See the full review report and BOM.
Drawings arrive. 23D coordinates and compiles. You get certainty.
01
Upload PDF, DWG, IFC, or other building files — send them as they are.
02
The system translates drawings into a unified building language, then compiles the coordination model, BOM, and conflict and exception reports. Anything that needs human confirmation is flagged clearly.
03
Resolve the few flagged ambiguities, then receive the full auditable package. Simple projects deliver directly; complex ones route through intake to align scope first.
No buzzwords. What v1 can and cannot do, we say clearly.
small & mid-size builders
a complete auditable pre-construction package
Next step
Real projects start in intake, takes a few steps to submit. Want to see the output first? Check the sample or try the demo.