Building Overview

4Stories
39.3 ftBuilding Height
9 ftWall Height
72Beams
14PSL Columns
237Joists
282Roof Rafters

HVAC System

564.9 ftDuct Length
8Equipment
23Risers

Fire Sprinkler System

574.3 ftPipe Length
53Heads
10Risers

Not yet included: electrical conduit, plumbing (full cross-trade coordination)

Floor Height Analysis

Floor-to-floor = wall height (9') + max beam depth + sheathing (0.75")

FloorBase ZMax Beam DepthFloor-to-Floor
level_10.00 ft14.00"10.23 ft
level_210.23 ft11.88"10.05 ft
level_320.28 ft11.88"10.05 ft
level_430.33 ft9.25"9.83 ft

Warnings 2 warnings

Warning

Header elevations needed clamping

Some headers were clamped against the story/top-plate envelope. 22 instances.

Warning

Blocks skipped during opening cutout

Block cutout skipped candidates; review affected openings. 77 instances.

Bill of Materials (BOM)

Framing Lumber

ItemQuantity
2x4 Studs5,681.7 ft
2x4 Plates2,162.5 ft
2x4 Blocks940.5 ft
2x4 Total8,784.7 ft
2x8 Studs3,147.2 ft
2x8 Plates1,507.1 ft
2x8 Blocks661.1 ft
2x8 Total5,315.5 ft
Opening Framing1,195.3 ft
Headers185.1 ft
Jack Studs683.9 ft
King Studs396.8 ft
Window Sills114.6 ft
Total Lumber Required15,480.7 ft

Stock Purchase List

2x48'114pcs
2x410'670pcs
2x412'32pcs
2x416'30pcs
2x418'3pcs
2x420'24pcs
2x88'159pcs
2x810'316pcs
2x812'10pcs
2x816'27pcs
2x818'5pcs
2x820'36pcs

Beam Detail

SectionCountTotal Length
14" Rim Board235.2 ft
3.5"x11.875" PSL16148.9 ft
3.5"x14" PSL548.0 ft
5.25"x11.875" PSL13180.3 ft
5.25"x9.25" PSL810.4 ft
7"x11.875" PSL14220.0 ft
7"x14" PSL363.8 ft
7"x9.25" PSL248.1 ft
2-2x10420.4 ft
3-2x10214.8 ft
2x10234.8 ft
Steel Beam123.3 ft
Total72848 ft

Joist Detail

FloorSectionSpacingSpanCountTotal Length
level_11.75"x14.0"16" OC8.1 ft48390.4 ft
level_11.75"x11.875"16" OC31.8 ft29922.1 ft
level_21.75"x11.875"16" OC23.3 ft481,117.8 ft
level_31.5"x5.5" (2x6)16" OC3.6 ft621.6 ft
level_31.5"x9.25" (2x10)16" OC7.2 ft36260.2 ft
level_31.5"x9.25" (2x10)16" OC16.0 ft48768.6 ft
level_41.5"x9.25" (2x10)24" OC5.0 ft1679.5 ft
level_41.5"x9.25" (2x10)24" OC17.4 ft6104.4 ft
Total2373,664.6 ft

Column Detail

SectionCount
3.5"x11.875" PSL 2.2E3
3.5"x7" PSL 1.8E10
7"x7" PSL 1.8E1
Total14

Foundation Concrete

Itemft³
Footing Volume549.215.6
Wall Volume227.56.4

MEP Pipe Detail

SystemDiameterTotal Length
HVAC4"49.0 ft
HVAC5"61.8 ft
HVAC6"215.4 ft
HVAC8"148.3 ft
HVAC10"26.5 ft
HVAC Riser6"63.9 ft
Sprinkler1.5"504.1 ft
Sprinkler2"47.7 ft
Sprinkler Riser2"22.5 ft
HVAC Total564.9 ft
Sprinkler Total574.3 ft

Clash Detection 8

8 clashes — all Hard (Sprinkler vs Structure)

Level 1 — Plan View0001Sprinkler pipe vs PSL column0004Sprinkler riser vs beam0005Sprinkler riser vs Steel Beam0006Sprinkler riser vs beamHard ClashBeamColumnLevel 2 — Plan View0002Sprinkler pipe vs PSL column0007Sprinkler pipe vs PSL column0008Sprinkler riser vs beam0009Sprinkler riser vs PSL columnHard ClashBeamColumn
IDSeverityDescription
CLH-0001HardLevel 1 · Sprinkler BM1.5 pipe vs 3.5"×11.875" PSL 2.2E column
CLH-0002HardLevel 2 · Sprinkler BM1.5 pipe vs 3.5"×7" PSL 1.8E column
CLH-0004HardLevel 1 · Sprinkler riser (up) vs 5.25×11.875 beam
CLH-0005HardLevel 1 · Sprinkler riser (up) vs Steel Beam
CLH-0006HardLevel 1 · Sprinkler riser (up) vs 7×11.875 beam
CLH-0007HardLevel 2 · Sprinkler BM1.5 pipe vs 3.5"×7" PSL 1.8E column
CLH-0008HardLevel 2 · Sprinkler riser (down) vs 7×11.875 beam
CLH-0009HardLevel 2 · Sprinkler riser (down) vs 3.5"×7" PSL 1.8E column

Download Coordination Model

Open in Rhino to review the full coordination model.